Pipeline Valve Settings

Location

Kane, PA

Man Hours

35,000+

This project was for the shop fabrication and field installation of the valve settings necessary to support the integration of well pads to new distribution pipelines. Work included:

  • Shop fabrication and hydrotesting of all valve settings.
  • Site clearing, grading, and preparation including ECD’s.
  • Installation of pad access roads as required.
  • Site excavation and installation of concrete piers and sleepers.
  • Installation of all pipe spools as well as owner supplied valves and appurtenances.
  • Sandblasting and coating of underground pipe welds and fittings.
  • Sandblasting and painting of above grade piping.
  • Delivery and placement of liquids storage tanks and associated piping.
  • Site restoration with geotextile fabric and gravel.